Ship work

Annual ritual
In the water, sails on.

Some minor electrical work to do. Couple of line fuses corroded over winter. New fuse block to go in with suitable drip loops should be a long term fix. Plan some polishing of polyester upper works, teak deck cleaning and sealing with a new product.

Leave a Reply

Your email address will not be published. Required fields are marked *