Negative bus to tidy new connections
Fault ffound Led indicators fixed dry solder joint.

Negative bus installed, led’s fixed, spare joinery stored forepeak, cabling for existing network (nmea2k) examined and mapped out for connection to new Raymarine ng network including, I hope, radar heading data, wind data if existing mast head instrument is serviceable. Bought a single led light yesterday, looking to reduce amperage load. Plugged in, no light. Grrrr. After a bit of thought is the lighting wired +/- or – /+? Led’s only work one way but no, the bulb is US. Ho hum, I’ll ask for a replacement tomorrow. Raining most of the day so good for inside work. And Ramnav say they can do reprogramming of radio with new ID codes (MMSI & ATIS) so I’ll drop that off tomorrow. Still cabling to tidy and cable clip but that is the heavy lifting done on low amperage 12V.