The first load of insulation has arrived, caravan out and getting ready to roll

Critical path analysis? No, but things are coming together on this project. I am hoping I get an interference fit for these boards, in between the cross beams. If that works it’ll save me glueing them in place. The next “layer” of insulation will be placed over these boards and fixed into crawl space “ceiling “. It’s a horrid job!!